Coal clean

Posted on Friday 1 January 2010

BVC has just handed over a major
project to a UK power station
enabling the ‘clean up’ and recycling
of spilt materials. The requirement
was to supply and install fixed pipe
work systems in coal conveyors and
buildings

BVC has just handed over a major
project to a UK power station
enabling the ‘clean up’ and recycling
of spilt materials. The requirement
was to supply and install fixed pipe
work systems in coal conveyors and
buildings which handle the coal from
rail delivery up to the boiler bunker
penthouse.

The installation of the pipe
systems, used in conjunction with
the mobile skips and vacuum plant,
has brought an extremely cost
effective solution. Plus, all materials
collected by the system can be
returned to the coal stockpile making
savings on resources.

Each of the pipe systems has been
designed for two people to carry out
heavy industrial vacuum cleaning
operations and bulk removal duties.

Published By

Western Business Media,
Dorset House, 64 High Street,
East Grinstead, RH19 3DE

01342 314 300
[email protected]

Contact us

Kelly Rose - HSM Editor
01342 314300
[email protected]

Louise Carter - Editorial Support
01342 333735
[email protected]

Christine Fitzgerald - Sales Manager
01342 333740
[email protected]

Sharon Miller - Production Manager
01342 333741
[email protected]

Health & Safety Matters