Leisure centre systems

Posted on Friday 1 January 2010

Big Foot Systems has supplied custom frame non-penetrative systems to support and secure rooftop plant at a new, state-of-the-art leisure centre.

The £11.3 million facility replaced the previous 1970s sports centre and swimming pool.

At the new leisure centre, Big Foot’s technical team worked closely with the mechanical contractors, to ensure the right solution was supplied to support AHUs on an exposed rooftop which experiences high, swirling wind speeds.

A tightly congested, exposed plant space meant that a greater technical consideration was required to ensure stability of the units in the winds of the exposed coast. Big Foot Systems was called in to provide the correct technical solution to adequately support the AHU plant whilst managing the loads to the roof.

Along with new swimming pools, the centre features a climbing wall, fitness suite, sports hall, dance studios, spinning studio, sauna and steam room.

Published By

Western Business Media,
Dorset House, 64 High Street,
East Grinstead, RH19 3DE

01342 314 300
[email protected]

Contact us

Kelly Rose - HSM Editor
01342 314300
[email protected]

Louise Carter - Editorial Support
01342 333735
[email protected]

Christine Fitzgerald - Sales Manager
01342 333740
[email protected]

Sharon Miller - Production Manager
01342 333741
[email protected]

Health & Safety Matters