Suck it and see
BVC has completed a Central
Vacuum Cleaning System for a
major UK smelter, providing a cost
effective solution to the removal of
material build up on high level
steelwork, which is transferred by the
convection heat gen
BVC has completed a Central
Vacuum Cleaning System for a
major UK smelter, providing a cost
effective solution to the removal of
material build up on high level
steelwork, which is transferred by the
convection heat generated by the
furnaces.
A pipe work system interconnects
22 strategically positioned hose
connection points, connected to an
existing mobile vacuum plant. The
whole cleaning operation can be
easily handled by two operators who
can attach a hose to a point as
frequently as required using standard
BVC hoses and tools.
A second BVC system has been
installed, remodelling and adding to
an existing 3in pipe system to serve a
process building spanning over
several floors.